- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 OM模拟题C卷英文[查看] What must a project do regardless of the building type or ENERGY STAR eligibility for EA Prerequisite Minimum Energy Performance?(Choose 2)
无论项目类型或者是否符合能源之星等级评估条件,为了满足EA先决条件 最低能效的要求,项目必须? A: Set up an ENERGY STAR Portfolio Manager profile 设置能源之星数据管理器 B: Demonstrate a 20% improvement over similar buildings 比类似建筑的能源表现高20% C: Benchmark site energy data of at least three similar buildings 根据至少三个类似建筑的场址能源数据进行基准测试 D: Install whole building energy meters if they are not already in place 安装整个建筑的能源计量,如果尚未安装的话 参考答案: AD
本题解释: 选择AD,本题解释A.Teams set up an ENERGY STAR portfolio manager profile if it does not already exist. This is where the energy consumption data will be stored and must be done regardless of whether or not the building type is eligible for an ENERGY STAR score. B.Case 2 requires a 25% improvement. C.This is only for Case 2 projects to benchmark against typical buildings. D.Confirm whether or not the building has the necessary metering for energy benchmarking. This will require the installation of whole building energy meters if they are not already in place. |
|