When establishing a baseline for building performance what will the audit team n

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题B卷英文[查看]
When establishing a baseline for building performance what will the audit team need to do?
(Choose 2)
当需要为建筑性能确立基线时,审计团队需要做什么?(选2项)
A: Document the current facility requirements 记录当前的设备要求
B: Compare the project building with similar building types 将项目建筑与类似建筑进行比较
C: Identify no and low-cost improvements 确认低成本和无成本改进措施
D: Collect 1-3 years of utility bills 收集1到3年的市政账单
E: Develop energy cost, demand, and use indexes 制定能源花费,需求和使用的指标

参考答案: DE

本题解释:
选择DE,本题解释A.This occurs before the analysis. B.This step is part of the ASHRAE Level 1 report. C.This is part of the ASHRAE Level 1 walk-through assessment. D.This is part of the energy analysis. E.This is part of the energy analysis.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 04:59 , Processed in 0.077302 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部