LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 631|回复: 0
打印 上一主题 下一主题

A project in a hot climate is considering attempting EA Credit Demand Response.

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题B卷英文[查看]
A project in a hot climate is considering attempting EA Credit Demand Response. Which actions will the project team need to take in order to participate?(Choose 2)
某地处热带的项目考虑申请EA 得分项 需求响应。项目团队需要采取哪些行动?(选2项)
A: Participate in a program for at least 10% of peak demand 参与涉及至少10%高峰需求的项目
B: Conduct one full test of the DR plan 执行完整的需求响应计划测试
C: Reschedule housekeeping activities to off-peak hours to reduce demand 将卫生清洁活动重新安排到非高峰时段来降低需求
D: Perform an energy model to determine permanent peak load shifting 建立能源模型来确定永久高峰负荷转移

参考答案: AB

本题解释:
选择AB,本题解释A.Projects must either participate at an existing demand response program for at least 10% of peak demand or provide infrastructure to take advantage of future demand response autonomic pricing programs. B.The DR system must include one test. C.While this is one strategy to reduce demand, it isn\'t needed for the credit. D.The peak load is based on one year\'s worth of utility data.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 04:57 , Processed in 0.074395 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部