A landscape architect is performing a yearly inspection of LID measures used for

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
A landscape architect is performing a yearly inspection of LID measures used for rainwater management and notices some standing water in a bioretention pond from a storm that occurred 3 days earlier. During the performance period what statement is true regarding the inspection?
景观设计师在进行LID低影响开发措施的年度检查,看到生态水池有一些多余的积水,在绩效期内,应该进行哪项措施
A: The issue will need to be addressed within 60 days 在60天内解决该问题
B: Standing water for longer than 72 hours is not an issue 如果积水超过72小时,则没有问题
C: As long as the pond does not overflow during the next rain event nothing needs to be done 只要水池不溢流就没问题
D: The pond will need to be pumped out 用水泵把水抽干

参考答案: A

本题解释:
选择A,本题解释Issues found during the yearly inspection have to be corrected within 60 days.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 04:59 , Processed in 0.075865 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部