A project team is working in a country that does not have WaterSense equivalents

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
A project team is working in a country that does not have WaterSense equivalents for fixture performance. For fixture and fitting replacement and retrofit policy which action should the project team take to achieve the prerequisite?
某国家没有WaterSense相关的洁具标准,对于洁具改造,项目团队要怎么做才能满足先决条件要求

A: Use calculations to show compliance 通过计算
B: Select a fixture performance of at least 20% below the baseline of EPAct 1992 选择用水量比EPAct 1992标准要低20%的洁具
C: Exclude the fixtures as necessary to show compliance 将洁具排除在要求之外
D: Use alternative water sources to show a reduction in potable water use 使用替代水源

参考答案: B

本题解释:
选择B,本题解释Countries that do not have WaterSense equivalents must comply with the fixture performance requirement that water use at least 20% below baseline and the EPAct\'s 1992 requirement.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 04:58 , Processed in 0.082314 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部