A project building has a renewable energy system to offset the building\\\'s ann

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:54 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题D卷英文[查看]
A project building has a renewable energy system to offset the building\'s annual energy use. The owner does not sell any of the energy back to the grid. What requirements must the renewable energy system meet to count toward EA Credit Renewable Energy and Carbon Offsets?
某项目利用可再生能源来降低建筑能耗,项目所产生的可再生能源没有送至市政电网。这个可再生能源还需要怎样做来满足EA得分点可再生能源和碳补偿的要求
A: The systems must mitigate Scope 2 emissions 系统必须是Scope 2排放
B: The owner must sell the RECs 业主必须售卖RECs证书
C: The system must be owned by the building owner 系统必须由业主拥有
D: The system must be submetered 系统必须有分项计量

参考答案: D

本题解释:
选择D,本题解释A.Carbon offsets are used to mitigate Scope 2 emissions. B.The owner doesn\'t have to sell the RECs.
When the system is owned by a third party and the owner sells the RECs separately from the electricity the project would need to purchase more RECs to count the renewable energy toward the project. C.The system could be leased, it doesn\'t have to be owned by the building owner. D.The system has to be submetered to determine how much energy use is being offset.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 08:41 , Processed in 0.077564 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部