A project building includes 80 on-site parking spaces and 24 off-street parking spaces. The on-site parking includes 4 motorcycle spaces and 4 bicycle parking spaces. How many parking spaces must be placed under cover for SS Credit Heat Island Reduction?
一个项目有80个现场停车位,还有24个停车位在场地之外,另外场地上还有4个摩托车停车位以及4个自行车停车位。为了满足SS得分点-降低热岛效应的要求,至少要有多少停车位有覆盖

A: 78
B: 40
C: 81
D: 60

参考答案: B

本题解释:
选择B,本题解释Here is one of those questions for which a portion of the requirement is buried into the reference guide itself rather than in the rating system documents.
Motorcycle spaces DO count as parking spaces.
Bicycle spaces DO NOT count as parking spaces
Total parking is based on what is in the LEED Project Boundary (not off-site parking).
The question said 84 spaces are on site. That is the starting point - 84 spaces within the LEED project boundary.
4 of those spaces are for motorcycles, so there are still 84.
4 of those spaces are for bicycles - subtract those to get to 80.
80 X 50% = 40 spaces need to be covered.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 06:14 , Processed in 0.074867 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部