试卷: LEED v4 OM模拟题B卷英文[查看]   A project team is documenting a buildings fixtures and fittings of a building built in 1980. The building has had major renovations to some of the restrooms since 1995. What would the project team need to do to set a baseline for WE Prerequisite Indoor Water Use Reduction.
 项目团队正在为建于1980年的建筑的设施和配件进行记录。这个建筑在1995年开始了对一些厕所的重大改造。为给WE先决条件 室内节水设置基线,项目团队需要?   A: Use a baseline of 150% 使用150%的基线标准 B: Use a prorated baseline 使用按比例分配的基线标准 C: 对设施和配件进行计量,并记录一年的计量数据来建立用水基线 D: Use a baseline of 120% 使用120%的基线标准     参考答案: B 
  本题解释: 选择B,本题解释Older buildings that have had major renovations to some of the restrooms since 1995 use a prorated baseline. |   
 
  
 |