- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 OM模拟题B卷英文[查看] A project with mixed-mode ventilation is located in an area where ozone exceeds the most recent three-year average. The mechanical portion of the project will comply with ASHRAE 62.1-2010. What else is required for minimum IAQ?
某混合模式通风的项目位于最近三年臭氧平均值超标的区域。项目的机械部分符合ASHRAE 62.1-2010. 为满足最低室内空气质量要求,还需要? A: Air-cleaning devices for ozone 臭氧空气净化器 B: Alarmed openings for naturally ventilated spaces 自然通风空间的开启报警 C: MERV 13 filters on all air returns 在回风处安装MERV13的滤网 D: CO2 monitors in all densely occupied areas 在人员密度高的区域安装CO2探头 参考答案: A
本题解释: 选择A,本题解释A.If the area has high ozone, ozone filters are required in the system for mechanical ventilation. B.This is one of the options for Enhanced IAQ Strategies. C.This is one of the options for Enhanced IAQ Strategies. D.This is one of the options for Enhanced IAQ Strategies. |
|