LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 285|回复: 0
打印 上一主题 下一主题

A project with mixed-mode ventilation is located in an area where ozone exceeds

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题B卷英文[查看]
A project with mixed-mode ventilation is located in an area where ozone exceeds the most recent three-year average. The mechanical portion of the project will comply with ASHRAE 62.1-2010. What else is required for minimum IAQ?
某混合模式通风的项目位于最近三年臭氧平均值超标的区域。项目的机械部分符合ASHRAE 62.1-2010. 为满足最低室内空气质量要求,还需要?
A: Air-cleaning devices for ozone 臭氧空气净化器
B: Alarmed openings for naturally ventilated spaces 自然通风空间的开启报警
C: MERV 13 filters on all air returns 在回风处安装MERV13的滤网
D: CO2 monitors in all densely occupied areas 在人员密度高的区域安装CO2探头

参考答案: A

本题解释:
选择A,本题解释A.If the area has high ozone, ozone filters are required in the system for mechanical ventilation. B.This is one of the options for Enhanced IAQ Strategies. C.This is one of the options for Enhanced IAQ Strategies. D.This is one of the options for Enhanced IAQ Strategies.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 09:10 , Processed in 0.078155 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部