LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 430|回复: 0
打印 上一主题 下一主题

A project team doesn\\\'t have end-use energy data available. If the team wants

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题B卷英文[查看]
A project team doesn\'t have end-use energy data available. If the team wants to submeter a ten-story building\'s individual energy end uses, how should this be determined?
项目团队没有终端用能数据。如果团队想要计量一个十层建筑单独的能源使用,需要?
A: By submetering each section of the building based on the occupancy type 根据入住类型分别计量建筑的每个部分
B: By using the results from the ASHRAE Level 1 walk-through analysis 使用ASHRAE级别1 走访分析的结果
C: By installing one submeter per floor for each energy type 为每种能源类型每层安装一个分表
D: By submetering all systems that use energy within the building 分别计量建筑内所有使用能源的系统?

参考答案: B

本题解释:
选择B,本题解释The walk-through performed for EA Prerequisite Minimum Energy Performance can be used to determine which end-uses to submeter.
Consulting CBECS can also be used to to estimate the typical end uses to meter.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 09:10 , Processed in 0.082000 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部