A project team is estimating common energy end uses using the CBECS 2003 End-Use

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题B卷英文[查看]
A project team is estimating common energy end uses using the CBECS 2003 End-Use Consumption Tables. What will the team be required to do when submetering the end-uses for EA Credit Advanced Energy Metering?
项目团队正在使用CBECS 2003终端消耗表来估算共同的能源终端用量。为满足EA 得分项 增强能源计量 对使用终端进行分项计量时,团队需要做什么?
A: Install revenue-grade meters 安装收入等级计量表
B: Use a building automation system or software for data collection 使用建筑自动化系统或软件来收集数据
C: Record end-use energy consumption at least daily 至少每天计量终端的能源使用量
D: Store data for at least 12 months 至少存储12个月的数据

参考答案: B

本题解释:
选择B,本题解释A.A revenue-grade meter is \'a measurement tool designed to meet strict accuracy standards required by code or law. Utility meters are often called revenue grade because their measurement directly results in a charge to the customer.\' - USGBC
These are not required for the project but they are the most accurate.
B.Teams pursuing the credit must use a building automation system or other energy reporting software for data collection.
This system must be able to generate an alarm when demand or consumption over a set time interval exceeds anticipated levels by more than 5%.
C.The increments are based on the utility billing or in one-hour increments, whichever is less.Meters must report data at least hourly.
D.Storage of 36 months is the minimum allowed.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 09:10 , Processed in 0.078441 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部