- 注册时间
 - 2012-6-6
 - 最后登录
 - 2025-9-5
 - 阅读权限
 - 200
 - 积分
 - 5712
 - 精华
 - 3
 - 帖子
 - 1765
  
 
 
 
    
 | 
试卷: LEED v4 OM模拟题B卷英文[查看]   A project building has an annual electricity use of 7,564,980 kWh and no other energy use. A submetered photovoltaic system generated 356,876 kWh during the same performance period. How many points is the project eligible for renewable energy generation?
 某项目建筑使用的年度电量为7,564,980千瓦时,并且没有使用其他能源。在相同的绩效期内,一个分开计量的光伏系统产生了356,876千瓦时。项目在可再生能源中可获得几分?   A: 2 B: 1 D: 3     参考答案: D 
  本题解释: 选择D,本题解释The equation for renewable energy is:
 (Renewable energy generated / Total building energy use) / 1.5%
 356,876 / 7,564,980 = 0.047
 0.047 / 0.015 = 3.1
 3 points.
 Don\'t forget there is a 5 point maximum for the credit, and exemplary performance can be earned for 10% of the total energy use with on-site renewable energy. |   
 
  
 |