LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 852|回复: 0
打印 上一主题 下一主题

A project team will earn two points for WE Credit Cooling Tower Water Use by mee

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-12-22 11:37:53 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
A project team will earn two points for WE Credit Cooling Tower Water Use by meeting the maximum number of cycles without additional treatment. Which action can the project team take to earn additional points?
项目团队将在WE得分项冷却塔用水中获得两分,因为项目无需额外处理即可满足最大循环次数要求。项目团队可以采取哪些措施来获得额外得分?

A: Increase the concentrations in the condenser water增加冷凝水浓度
B: Add filtration增加过滤
C: Decrease the number of cycles of concentration 减少浓度循环次数
D: Use 20% alternative water sources 使用20%的替代水源

参考答案: D

本题解释:
选择D,本题解释 A.The goal is to decrease the concentrations. C.The goal is to increase the cycles. D.If a project meets the minimum number of cycles to earn two points, an additional 1-2 points (depending on the rating system) can be earned by using at least 20% recycled non-potable water.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 10:26 , Processed in 0.080059 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部