- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题D卷英文[查看] A project team pursuing IP Credit Integrative Process has assessed two potential locations during the discovery phase for site selection. When documenting how the analysis informed the OPR and BOD what additional documentation will be needed for the credit?
A: Narrative explaining how occupant feedback will be gathered B: Copy of the leasing agreement C: Tenant education guide D: Daylighting analysis 参考答案: A
本题解释: 选择A ,本题解释Commit to the establishment and use of ongoing feedback mechanisms that provide information about tenant space performance and occupants’ satisfaction. Provide documentation of methods planned to gather feedback on occupants’ satisfaction.
This feedback mechanism is required for site selection, energy, and water-related systems.
|
|