LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 289|回复: 0
打印 上一主题 下一主题

What must a retail project do for the prescriptive compliance path of EA Prerequ

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-10-7 21:55:12 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题D卷英文[查看]
What must a retail project do for the prescriptive compliance path of EA Prerequisite Minimum Energy Performance?
A: Install ENERGY STAR products for 50% of the total ENERGY STAR eligible products
B: Reduce connected lighting power density by 5% below ASHRAE 90.1-2010
C: For the tenant fit-out of spaces, provide a separate control zone for each solar exposure and interior space.
D: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under

参考答案: B

本题解释:
选择B,本题解释A.50%, not 100% B.This is correct. C.This is an option to earn points for the prescriptive path of the credit. D.This is an option to earn points for the prescriptive path of the credit.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 11:53 , Processed in 0.072861 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部