LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 318|回复: 0
打印 上一主题 下一主题

A contractor is planning for an occupied flush-out to reduce IAQ problems from t

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-30 16:01:52 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
A contractor is planning for an occupied flush-out to reduce IAQ problems from the construction of an office. The contractor introduces 3,500 cubic feet of outdoor air per square foot of floor area 3 hours prior to the first occupants arriving. What will need to be done next to achieve EQ Credit Construction IAQ Assessment?
A: Continue the flushout until a total of 14,000 cubic feet per square foot of outside air has been delivered to the space
B: Nothing, the flush-out is complete
C: Flush out the space with 3,500 cubic feet of outside air per square foot of floor area each day for a period of 7 days
D: Conduct a baseline IAQ test

参考答案: A

本题解释:
Notes: For an occupied flush-out 3,500 cu. ft. air / sq. ft. must be used prior to occupancy. Ventilation must begin at least 3 hours prior to occupancy until a total of 14,000 cu. ft. air / sq. ft. of air has been introduced.
Option 1 Path 2 still requires a total volume of air of 14,000 cu. ft. / SF to earn the credit, after the initial 3,500 has been introduced.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 17:00 , Processed in 0.074248 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部