Which action must a project team take for implementation of the IP Credit Integr

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-30 07:42:57 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题C卷英文[查看]
Which action must a project team take for implementation of the IP Credit Integrative Process?
A: Perform a site assessment during the pre-design phase
B: Create a simple life-cycle assessment of the design
C: Document how the analysis informed building and site design decisions in the project\'s OPR and BOD
D: Conduct a minimum four-hour integrated design charrette

参考答案: C

本题解释:
Notes:A:For the credit, only energy and water analysis is required.B:This is not correct.C:For the credit, a narrative must be included that documents how analyses informed design.D:This is required for the LEED BD+C: Healthcare Prerequisite.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 18:49 , Processed in 0.085679 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部