A project team is reviewing material choices before deciding which products to include. The team located interior wall partitions made with recycled content that have been salvaged from another building. The partitions are available from a company located 50 miles (80 km) from the project site for the price of $20,000. What value do the partitions have toward MR Credit Building Product Disclosure and Optimization - Sourcing of Raw Materials?
A: $0
B: $40,000
C: $20,000
D: $60,000

参考答案: B

本题解释:
选择B,本题解释 See MR Overview Location Valuation Factor.

For a product to qualify for the location valuation factor, two criteria must be met:
1. Sustainability criteria
2. Extraction, manufacture, and purchase within the radius.

If the product isn\'t sustainable, it counts as 0%.
If the product meets multiple sustainability criteria, it doesn\'t count more toward the total (salvaged material that contains recycled content can\'t be double counted).
$20,000 X 200% location valuation factor = $40,000
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 18:51 , Processed in 0.079119 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部