LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 293|回复: 0
打印 上一主题 下一主题

An office project will have a 5% energy improvement over a baseline building. Th

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-27 07:33:19 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题B卷英文[查看]
An office project will have a 5% energy improvement over a baseline building. The project team is considering increasing ventilation. The project uses mechanical ventilation. This change could have a negative impact on:

A: EQ Credit Daylight
B: EA Prerequisite Fundamental Refrigerant Management
C: EA Prerequisite Minimum Energy Performance
D: EA Credit Optimize Energy Performance

参考答案: C

本题解释:
选择C,本题解释Increasing the ventilation of a building that uses mechanical ventilation will require a larger HVAC system capacity and greater energy use. Since the baseline building energy performance would change, EA Prerequisite Minimum Energy Performance will be impacted.
The building has a 5% energy performance improvement which is enough for the prerequisite but falls short of the minimum for Optimize Energy Performance. Since the project cannot earn Optimize Energy Performance, this credit will not be affected.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 18:38 , Processed in 0.075413 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部