- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 ID+C模拟题B卷英文[查看] A project team is designing a tenant space in the top three floors of a 50-story high-rise building. WaterSense labeled fixtures and fittings are being reviewed for WE Prerequisite Indoor Water Use Reduction. Which action should occur to ensure building occupants are satisfied with the fixtures and fittings? A: Selecting no aerators that are labeled with WaterSense B: Verifying that no dual-flush toilets are installed C: Determining that fixtures will not have performance problems D: Avoiding the use of waterless urinals in public restrooms 参考答案: C
本题解释: 选择C,本题解释In high-rises and in different areas where water pressure can vary, it is important for the MEP engineer to address the delivery pressure of the water. By working with the MEP engineer and architect at the project kickoff meeting, specifications can be set so no water pressure issues occur. |
|