A project team member was not clear about the specifications for building materi

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-23 16:55:09 |只看该作者 |倒序浏览
试卷: LEED v4 ID+C模拟题A卷英文[查看]
A project team member was not clear about the specifications for building materials, and a contractor substituted a product with disclosure documentation for a product without disclosure documentation. The replacement product has a GreenScreen v1.2 Benchmark. How should the product be treated as it applies to MR Credit Building Product Disclosure and Optimization - Material Ingredients?
A: Treat the product at 50% of its cost
B: Exclude the product from both the disclosure and optimization options
C: Exclude the product from the disclosure option and include it in the optimization option
D: Include the product in both the disclosure option and the optimization option

参考答案: C

本题解释:
Notes: Each Building Product Disclosure and Optimization credit has an option for disclosure and another option for optimization. Each option is worth 1 point, and projects can earn 2 points each for the credit.
Earning 1 point for Option 2 optimization is allowed without earning Option 1 disclosure for each credit.
In this scenario, the product does not have disclosure (because the product was substituted), but it does have optimization by having the GreenScreen v1.2 Benchmark which counts toward Option 2.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 20:27 , Processed in 0.076142 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部