LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 834|回复: 0
打印 上一主题 下一主题

A project team is reviewing available site derived non-potable water sources tha

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2016-9-19 13:38:34 |只看该作者 |倒序浏览
试卷: LEED v4 OM模拟题A卷英文[查看]
A project team is reviewing available site derived non-potable water sources that can be used to offset a portion of the potable water use for makeup water. What are the best sources of makeup water?(Choose 2)
项目团队正在审查可用于现场的非饮用水源,这些水源可用于抵消补给水的一部分饮用水。什么是补水的最佳来源?(选2项)
A: Graywater灰水
B: Air-conditioning condensate空调冷凝水
C: Rainwater collected from building roofs从建筑屋顶收集的雨水
D: Stormwater runoff from the ground surface地表的雨水径流

参考答案: BC

本题解释:
选择BC,本题解释 When considering alternative water, it is important to consider the water type. Some alternative water sources have lower concentration of solids such as rainwater and condensate, whereas graywater and ground runoff may need additional treatment.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 22:12 , Processed in 0.074489 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部