LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 322|回复: 0
打印 上一主题 下一主题

Which team member is responsible for completing a test after occupancy that conf

[复制链接]

1759

主题

1

好友

5722

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-12-25 16:53:25 |只看该作者 |倒序浏览
试卷: WELL AP模拟题英文B卷[查看]
Which person is responsible for completing a performance test after occupancy that verifies the project is meeting minimum air quality requirements? 谁负责在入住后完成性能测试,验证项目符合最低空气质量要求?
A: MEP Engineer 机电工程师
B: Commissioning Authority 调试机构
C: General Contractor 总包
D: WELL Assessor WELL评审员

参考答案: D

本题解释:
正确答案:D
解析:The WELL Assessor will complete a performance test after occupancy for Feature 01 Air Quality Standards during the Performance Verification site visit.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-12-22 00:22 , Processed in 0.079989 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部