On a previously developed site with a water body on the property, which minor im

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-4-13 09:15:01 |只看该作者 |倒序浏览
试卷: LEED v4 BD+C英文模拟题(A)[查看]
On a previously developed site with a water body on the property, which minor improvements are allowed in the water-body buffer? (Choose 3)
A: Clearance of 600 square feet (56 m2) for a picnic area
B: A 10-foot (3 meter) wide impervious walking path
C: Grade changes to ensure access for all users
D: Maintenance shed
E: Bike pathways

参考答案: CDE

本题解释:
正确答案:CDE
解析:C:This is allowed.
D:This is allowed.
E:This is allowed.
A:Clearings are limited to 500 SF (45 m2).
B:A bike path/walkway can be a maximum of 12-feet wide (3.5 meters) with an impervious limit of 8-feet wide (2.5 meters). A good design might be an 8-foot impervious trail with 2 feet of gravel on either side.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-14 03:34 , Processed in 0.075203 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部