- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 BD+C英文模拟题(A)[查看] On a previously developed site with a water body on the property, which minor improvements are allowed in the water-body buffer? (Choose 3) A: Clearance of 600 square feet (56 m2) for a picnic area B: A 10-foot (3 meter) wide impervious walking path C: Grade changes to ensure access for all users D: Maintenance shed E: Bike pathways 参考答案: CDE
本题解释: 正确答案:CDE
解析:C:This is allowed.
D:This is allowed.
E:This is allowed.
A:Clearings are limited to 500 SF (45 m2).
B:A bike path/walkway can be a maximum of 12-feet wide (3.5 meters) with an impervious limit of 8-feet wide (2.5 meters). A good design might be an 8-foot impervious trail with 2 feet of gravel on either side. |
|