LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 264|回复: 0
打印 上一主题 下一主题

A project team is reviewing a simple box energy model for a large commercial bui

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-4-13 09:15:01 |只看该作者 |倒序浏览
试卷: LEED v4 BD+C英文模拟题(A)[查看]
A project team is reviewing a simple box energy model for a large commercial building dominated by external loads. Which strategy can help decrease envelope loads?
A: Reducing plug loads
B: Demanding controlled ventilation
C: Decreasing lighting power
D: Increasing the insulating value of the glazing and window frame system

参考答案: D

本题解释:
正确答案:D
解析:D:This would impact the building envelope load.
A:This decreases internal loads.
B:This decreases internal loads.
C:This decreases internal loads.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-14 04:48 , Processed in 0.219026 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部