- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 BD+C英文模拟题(A)[查看] Which strategy would help a project team earn exemplary performance for SS Credit Heat Island Reduction on a project with a zero-lot line and a low-sloped roof? A: Shade the entire roof with a renewable energy system B: Have 100% underground parking and install a vegetated roof on top of the building C: Cover 100% of the building roof with a three-year aged SRI material of at least 64 D: Cover 100% of the building roof with a material that has an initial SRI of 39 参考答案: B
本题解释: 正确答案:B
解析:B:For exemplary performance, a project must achieve both Option 1 and Option 2 of the credit, and for Option 2, 100% of the parking must be under cover. |
|