- 注册时间
- 2012-6-6
- 最后登录
- 2025-9-5
- 阅读权限
- 200
- 积分
- 5712
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED v4 GA模拟题B卷[查看] Which of the following statements define Life Cycle Cost and Life Cycle Assessment?(Choose 2) A: Life Cycle Cost focuses on economics B: Life Cycle Assessment focuses on the environment and people C: Life Cycle Cost focuses on the environment, people and economics D: Life Cycle Assessment focuses on economics 参考答案: AB
本题解释: 正确答案:AB
系统解析: Knowledge Domain: Materials and Resources (MR) and Project Surroundings and Public Outreach
Value Engineering (VE) is an important factor to consider when evaluating any project’s cost vs it’s value. Value engineering is used as a cost cutting exercise, often late in the process when costs need to be cut from the budget. When components are VE’d out of the project late, the project and the owner suffer a consequence. Value engineering tends to generate project cuts, which successfully lessen the construction costs, but usually lessen the true value. However, when using an integrated design process, considering value engineering with the life cycle cost of a building will reflect the efficiency of a building long after it is built and occupied.
Materials and Resources (MR) > life-cycle impacts > concept of life-cycle assessment and Surroundings and Public Outreach > values of sustainable design > costs > life-cycle
|
|