A refrigerated warehouse project in the design phase could reduce its electricit

[复制链接]

1759

主题

1

好友

5712

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2015-3-3 13:51:38 |只看该作者 |倒序浏览
试卷: LEED v4 GA模拟题C卷[查看]
A refrigerated warehouse project in the design phase could reduce its electricity usage by taking which of the following actions?
A: Purchasing RECs
B: Purchasing carbon offsets to counter GHG emissions
C: Purchasing all electricity from a wind farm
D: Enrolling in a demand response program

参考答案: D

本题解释:
正确答案:D
系统解析: D:’Demand response allows utilities to call on buildings to decrease their electricity use during peak times, reducing the strain on the grid and the need to operate more power plants, thus potentially avoiding the costs of constructing new plants.’ - USGBC

A demand response program can work for the most demanding energy projects - data centers, refrigeration, or fully occupied buildings in areas that hit 110 F degrees (43 C) in the summer.

A:RECs do not alter a building’s electricity use.

B:Carbon offsets do not alter a building’s electricity use.

C:While this choice is better than using fossil fuel based electricity, it does not reduce the electricity usage of the building.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-14 00:22 , Processed in 0.076705 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部