LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 289|回复: 0
打印 上一主题 下一主题

How could the project team calculate any reduction in indoor plumbing fixture an

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-11-5 16:53:14 |只看该作者 |倒序浏览
试卷: LEED AP EB模拟题 B卷[查看]
How could the project team calculate any reduction in indoor plumbing fixture and fitting
potable water use for WE Credit 2 Additional Indoor Plumbing Fixture and Fitting Efficiency?
A: Calculate the costs savings from all metered systems compared to the previous performance period\'s utility bills
B: Calculate the percent reduction from the baseline
C: Submeter all non-plumbing fixtures in th e building and subtract the amount from the whole building metering
D: Calculate the percent reduction from the UPC 2006 or IPC 2006 standards

参考答案: B

本题解释:
Notes:
See Reference Guide, WE Prerequisite 1, Calculations because it is this section that is used
to describe calculations for WE Credit 2.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 23:38 , Processed in 0.079772 second(s), 26 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部