- 注册时间
- 2012-6-16
- 最后登录
- 2023-9-11
- 阅读权限
- 150
- 积分
- 512
- 精华
- 0
- 帖子
- 213
 
|
试卷: LEED AP EB模拟题 B卷[查看] When can a space affected by a flushout be occupied to achieve IEQ Credit 1.5 IAQ Best
Management Practices - Indoor Air Quality Management for Facility Additions and
Alterations? A: After an outdoor air volume of 14,000 cf. / sq . ft. of floor area has been delivered at the required temperature/humidity B: After an outdoor air volume of 3,500 cf. / sq. ft. of floor area has been delivered for two hours C: After the minimum flushout rate as specified by ASHRAE 62.1-2007 has been delivered D: 3 hours after the flushout begins 参考答案: A
本题解释: Notes:
Reference: IEQ Credit 1.5, Implementation, Flush-out Procedure
A building can be occupied after a total volume of 14,000 cubic feet of outdoor air per
square foot has been ventilated.
A building can also be occupied after 3,500 cubic feet of outdoor air per square foot has
been ventilated for at least 3 hours (not 2 hours) |
|