LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 194|回复: 0
打印 上一主题 下一主题

A project team had a utility company install a photovoltaic system where the uti

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-9-21 18:23:36 |只看该作者 |倒序浏览
试卷: LEED AP EB模拟题 A卷[查看]
A project team had a utility company install a photovoltaic system where the utility company
retained the environmental benefit attributes of the system. What statement is true
regarding this system?
A: The project will not be able to participate in a net metering program, if available
B: The system will reduce the amount of energy consumed by the project
C: The energy produced by the system is ineligible for EA Credit 4 On-Site and Off-Site Renewable Energy
D: The project can participate in a net mete ring program and sell back the electricity at a premium

参考答案: C

本题解释:
Notes:
Reference: O&M Reference Guide, EA Credit 4, Implementation, Re tention of Renewable
Energy Environme

If the environmental attributes are retired or retained, the energy is ineligible. Power sold
back to the grid cannot be sold at a premium, because this indicates that the environmental
attributes are being sold.

Renewable energy systems do not reduce the amount of energy consumed; they only alter
the type of energy consumed.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 17:43 , Processed in 0.073401 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部