- 注册时间
- 2012-6-16
- 最后登录
- 2023-9-11
- 阅读权限
- 150
- 积分
- 512
- 精华
- 0
- 帖子
- 213
 
|
试卷: LEED AP ND模拟题C[查看] A project team has determined the buildable and nonbuildable land for a project. Under what circumstances can the developer exclude additional land from the base buildable land area?
A: When the land will be used for roadways B: When the land is set aside as park space C: When the land is protected from construction and located near a waterway D: When additional land is set aside for nonbuildable purposes 参考答案: C
本题解释: Up to 15% of the base buildable land area can be excluded if the land is protected from construction and located next to a waterway or other protected area controlled by a public entity.
|
|