LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 193|回复: 0
打印 上一主题 下一主题

A project has residential density of 15 dwelling units/acre. The nonresidential

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-8-29 08:28:15 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题C[查看]
A project has residential density of 15 dwelling units/acre. The nonresidential density is 1.5 FAR. What minimum percentage of the undeveloped area must remain undisturbed to earn GIB Credit Minimized Site Disturbance in Design and Construction?

A: 5%
B: 15%
C: 20%
D: 10%

参考答案: B

本题解释:
What you need to remember for this credit is the thresholds are 10%, 15%, and 20%. The minimum area to leave undisturbed is the greater percentage of the nonresidential density FAR or residential density / acre based on the values in the table.

In this example the 15 DU / acre require 15% minimum undisturbed area. The 1.5 FAR only requires 10%.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-8 07:11 , Processed in 0.073526 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部