试卷: LEED AP ND模拟题B[查看] After consulting with a transit agency, the developer installs approved shelters at all stop locations that will serve the project. Bicycle racks are required by the transit agency. What will the developer need to install for NPD Credit Transit Facilities?
A: Bicycle racks with two-point support system racks at all transit stop locations that were identified B: Bicycle racks with a single support rack at all present and future transit stops within 1/4 mile of the project boundary C: Secure bicycle shelters at 50% of the transit stops D: Bicycle racks with a single support rack at all present transit stops within 1/4 mile of the project boundary 参考答案: A
本题解释: Two-point support system racks must be installed at the identified locations |
|