project will have three mixed-use buildings of four stories. All of the buildings exist on the property and will be renovated. What must occur for the project to earn exemplary performance for GIB Credit Building Energy Efficiency?

A: Demonstrate a 30% improvement over ASHRAE 90.1-2007 for at least 90% of the building floor area
B: Achieve a HERS index of at least 75 for each building
C: Achieve 90% of the prescriptive requirements of ASHRAE Advanced Energy Design Guide for Small Buildings
D: Achieve an average HERS index of at least 65 for all buildings

参考答案: A

本题解释:
A 30% improvement is required for existing buildings.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 20:47 , Processed in 0.086132 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部