A project will include construction on a portion of undeveloped land. What must

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-7-24 14:56:08 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题C[查看]
A project will include construction on a portion of undeveloped land. What must the project team do to earn GIB Credit Minimized Site Disturbance in Design and Construction?

A: Preserve a minimum of 10% of all noninvasive trees larger than 12 inches diameter at breast height (dbh) and 6 inches dbh if
B: Limit site disturbance to 25 feet beyond the building perimeter
C: Develop a tree preservation management plan approved by an ISA-certified arborist
D: Do not disturb trees closer than 25 feet from the tree\'s drip line

参考答案: C

本题解释:
A:The minimum is 25%, not 10%.
B:This limit is 40 feet, not 25 feet.
C: This plan is required for the health of the trees and protection during construction.
D: 15 feet is the minimum.


Notes:

Reference: GIB C7, Requirements


分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 18:22 , Processed in 0.073604 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部