LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 194|回复: 0
打印 上一主题 下一主题

A mixed-use project has blocks that are 1,000 feet long. The project will have 1

[复制链接]

203

主题

0

好友

512

积分

超级版主

Rank: 8Rank: 8

跳转到指定楼层
楼主
发表于 2013-7-24 14:56:08 |只看该作者 |倒序浏览
试卷: LEED AP ND模拟题A[查看]
A mixed-use project has blocks that are 1,000 feet long. The project will have 15 buildings. What design for recycling containers would qualify for GIB Credit Solid Waste Management Infrastructure?

A: Installing recycling containers on the corner of every block
B: Installing recycling containers next to receptacles in the middle of every block
C: Recycling containers attached to receptacles, installed every 800 feet
D: Installing recycling containers inside of every building

参考答案: C

本题解释:
Recycling containers must be installed for the shorter of every block or at least every 800 feet. Since the blocks are 1,000 feet, the 800 foot maximum must be met
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 16:15 , Processed in 0.072850 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部