- 注册时间
- 2012-6-16
- 最后登录
- 2023-9-11
- 阅读权限
- 150
- 积分
- 512
- 精华
- 0
- 帖子
- 213
 
|
试卷: LEED AP ND模拟题A[查看] A mixed-use project has blocks that are 1,000 feet long. The project will have 15 buildings. What design for recycling containers would qualify for GIB Credit Solid Waste Management Infrastructure?
A: Installing recycling containers on the corner of every block B: Installing recycling containers next to receptacles in the middle of every block C: Recycling containers attached to receptacles, installed every 800 feet D: Installing recycling containers inside of every building 参考答案: C
本题解释: Recycling containers must be installed for the shorter of every block or at least every 800 feet. Since the blocks are 1,000 feet, the 800 foot maximum must be met |
|