A project has already qualified for one point under Sustainable Sites credit, He

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-10-23 14:24:31 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题E[查看]
A project has already qualified for one point under Sustainable Sites credit, Heat Island Effect: Non-Roof by having 50% of the parking spaces under the building. The design team would like to earn an additional exemplary performance point for this credit. Which of the following would allow the project to earn two points for this credit? (choose 2)
A: Place 100% of the parking under the building
B: Shade at least 50% of the site hardscape within 5 years
C: Design all impervious surfaces to be have high-albedo or open-grid paving materials
D: Place an additional 25% of the parking under cover
E: An additional exemplary performance point is not available for this credit

参考答案: AC

本题解释:
Notes:
See the “Exemplary Performance” section of NC SSc7.1.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-7 03:24 , Processed in 0.074157 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部