- 注册时间
- 2012-6-6
- 最后登录
- 2025-7-5
- 阅读权限
- 200
- 积分
- 5692
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED GA模拟题C[查看] A construction waste management plan should address what items? A: What materials should be diverted from the waste stream B: The use of certified wood C: Source reduction D: Rapidly renewable materials 参考答案: A
本题解释: Notes:
Reference: LEED 2009 for New Construction and Major Renovations Rating System
A construction waste management plan should address what materials will be diverted from the landfill, as well as how they will be diverted and how the plan will be policed. For example:
Will we recycle cardboard? What types of bins will we need? Where will they be stored? How will we protect the material from rain?
The use of certified wood is a design decision related to sustainable materials selection.
Source reduction is the process of reducing product size and packaging needs that occur at the point of manufacturing, not at the construction site.
The use of rapidly renewable materials is a design decision related to sustainable materials selection. |
|