What should be included in a construction waste management plan for the demoliti

[复制链接]

1759

主题

1

好友

5692

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-29 17:18:22 |只看该作者 |倒序浏览
试卷: LEED AP BD+C模拟题B[查看]
What should be included in a construction waste management plan for the demolition
of an existing building?
A: Where to dispose of any PCBs
B: The design of the size of the building
C: The removal of any CFC-based refrigerants
D: Installation of a composting system for occupants

参考答案: A

本题解释:
Hazardous material removal is part of the plan. Hazardous materials do not
count toward the percent of debris diverted from landfills but they are still
included in the waste management plan.

The size of the building impacts the quantity of construction waste, but this
decision is not part of the construction waste management plan.

CFC removal would be done by a specialist. This would not be part of the
waste management plan.

Composting would occur post-construction when the building has occupants.

Reference: LEED 2009 for New Construction and Major Renovations Rating System
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-6 22:01 , Processed in 0.073603 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部