- 注册时间
- 2012-6-6
- 最后登录
- 2025-7-5
- 阅读权限
- 200
- 积分
- 5692
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED AP BD+C模拟题E[查看] ASHRAE Standard 55-2004 lists the primary factors of thermal comfort as air temperature, radiant temperature, air speed, and humidity. For the purposes of Indoor Environmental Quality credit, Controllability of Systems: Thermal Comfort, what defines comfort system control? A: Control over temperature only B: Control over temperature and humidity C: Control over air speed and temperature D: Control over any two of the primary factors E: Control over any one of the primary factors 参考答案: E
本题解释: Notes:
See the “Requirements” section of IEQc 6.2, Controllability of Systems-Thermal Comfort
|
|