LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 275|回复: 0
打印 上一主题 下一主题

A project team demolishes an existing building and will reuse the shell of the b

[复制链接]

262

主题

0

好友

33

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-15 16:57:57 |只看该作者 |倒序浏览
试卷: LEED GA模拟题F[查看]
A project team demolishes an existing building and will reuse the shell of the building and recycle the rest of the construction and demolition debris. What credit areas could the project earn points under?(choose 2)


A: Building Reuse
B: Recycled Content
C: Construction Waste Management
D: Community Connectivity

参考答案: AC

本题解释:
A Building reuse can be earned when projects reuse existing portions of a building including the exterior walls, roof, structural flooring, interior walls, etc.
B Note the difference between recycling and the use of recycled content. Recycling is the act of keeping materials out of landfills to reduce the demand for virgin resources. Recycled content are materials that contain pre or post consumer recycled content.
C The recycled debris would help the project divert waste from landfills and earn credit for construction waste management.
D Reusing an existing building does not imply community connectivity can be earned. Community connectivity is achieved when a project is located near basic services, and there is pedestrian access between those services.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-5 13:09 , Processed in 0.083583 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部