- 注册时间
- 2012-6-28
- 最后登录
- 2012-12-19
- 阅读权限
- 200
- 积分
- 33
- 精华
- 0
- 帖子
- 264
  
|
试卷: LEED GA模拟题F[查看] A project team demolishes an existing building and will reuse the shell of the building and recycle the rest of the construction and demolition debris. What credit areas could the project earn points under?(choose 2)
A: Building Reuse B: Recycled Content C: Construction Waste Management D: Community Connectivity 参考答案: AC
本题解释: A Building reuse can be earned when projects reuse existing portions of a building including the exterior walls, roof, structural flooring, interior walls, etc.
B Note the difference between recycling and the use of recycled content. Recycling is the act of keeping materials out of landfills to reduce the demand for virgin resources. Recycled content are materials that contain pre or post consumer recycled content.
C The recycled debris would help the project divert waste from landfills and earn credit for construction waste management.
D Reusing an existing building does not imply community connectivity can be earned. Community connectivity is achieved when a project is located near basic services, and there is pedestrian access between those services.
|
|