A project team has selected a previously developed lot in an urban area to build a new condominium. If the project site is near a public library what would this help with?

A: Community connectivity
B: Preserving any historical surroundings
C: Reducing the heat island effect
D: Meeting local zoning requirements

参考答案: A

本题解释:
A public library is a basic service.

Community connectivity is the quantity of connection between a site and the surrounding community. It is measured by pedestrian access to housing basic services such as restaurants, post offices, hospitals, libraries, etc.

Building on a previously developed lot does not preserve the historical surroundings.

The type of lot selected does not address the heat island effect. It is what happens to the lot later that can impact the heat island effect, such as the quantity of hardscapes and the choice of materials used for paving.

Nothing in this scenario addresses meeting zoning requirements.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-5 12:35 , Processed in 0.073125 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部