试卷: LEED GA模拟题C[查看] How is the LEED boundary defined for a single building development?(choose 2) A: The entire project scope - generally limited to the site boundary B: The edge of the development footprint C: The portion of project site submitted for LEED certification D: The edge of the building footprint 参考答案: AC
本题解释: The LEED boundary is the portion of the project site submitted for LEED certification. For single-building developments, this is the entire project scope and is generally limited to the site boundary.
B:This is the same scenario as the building footprint. The project boundary and development footprint might be the same but the correct term is the portion of the project site submitted for LEED certification.
C:The LEED boundary is the portion of the project site submitted for LEED certification. For single-building developments, this is the entire project scope and is generally limited to the site boundary. For multiple building developments, the LEED project boundary may be a portion of the development as determined by the project team. (-USGBC)
D: The edge of the building does not necessarily define the project boundary unless in the case where there is zero parking lots above ground, zero hardscapes, and zero landscape around the perimeter. |
|