LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
查看: 297|回复: 0
打印 上一主题 下一主题

How is the LEED boundary defined for a single building development?(choose 2)

[复制链接]

1759

主题

1

好友

5690

积分

管理员

Rank: 9Rank: 9Rank: 9

跳转到指定楼层
楼主
发表于 2012-9-15 16:56:55 |只看该作者 |倒序浏览
试卷: LEED GA模拟题C[查看]
How is the LEED boundary defined for a single building development?(choose 2)
A: The entire project scope - generally limited to the site boundary
B: The edge of the development footprint
C: The portion of project site submitted for LEED certification
D: The edge of the building footprint

参考答案: AC

本题解释:
The LEED boundary is the portion of the project site submitted for LEED certification. For single-building developments, this is the entire project scope and is generally limited to the site boundary.

B:This is the same scenario as the building footprint. The project boundary and development footprint might be the same but the correct term is the portion of the project site submitted for LEED certification.

C:The LEED boundary is the portion of the project site submitted for LEED certification. For single-building developments, this is the entire project scope and is generally limited to the site boundary. For multiple building developments, the LEED project boundary may be a portion of the development as determined by the project team. (-USGBC)

D: The edge of the building does not necessarily define the project boundary unless in the case where there is zero parking lots above ground, zero hardscapes, and zero landscape around the perimeter.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-7-5 09:44 , Processed in 0.074664 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部