- 注册时间
- 2012-6-6
- 最后登录
- 2025-4-28
- 阅读权限
- 200
- 积分
- 5684
- 精华
- 3
- 帖子
- 1765
  
|
试卷: LEED GA模拟题D[查看] Compared to conventional building a green building project and construction budget will also include: A: Life cycle costing B: Soft costs C: Costs to implement erosion control plans D: ees to review local laws and standards 参考答案: A
本题解释: Notes:
Reference: Sustainable Building Technical Manual: Part II
A: The manual states project teams should determine relevant design fees and construction costs. Also address:
1. Life cycle costing
2. Design and cost advice from experienced green building professionals
3. Contingencies for research of unconventional techniques or materials
Life cycle costing compares different designs to determine the best long-term investment. All building expenses are included in the analysis including:
Initial costs (design + construction)
Operating costs (utilities, water, electricity, people)
Maintenance costs (repair, replacement, upkeep)
B:All projects have soft costs.
Soft costs: These costs involve all of the other fees involved in the completion of the project. You would include your attorney fees, other professional fees, testing, appraisal, marketing, office, and overhead expenses. Soft costs are those expenditures necessary to complete a project but not directly \'bricks and mortar,\' such as design and consultant fees, communications costs, interim housing, moving or relocation costs, and additional district staffing.
C:All projects have erosion control - it is required at the federal level.
D:Reviewing things like local zoning and ordinances are applicable to all building projects. |
|