A project team has not been able to perform an energy simulation for Energy and Atmosphere
Credit, Optimize Energy Performance. For Energy and Atmosphere Credit, On-Site Renewable
Energy, where can the project team find information to determine the energy cost supplied by the
renewable energy systems?
A: Registered Project Tools database
B: US DOE 2003 Commercial Sector Average Energy Costs by State
C: Commercial Buildings Energy Consumption Survey
D: EPA Energy Guide by Metro Area

参考答案: C

本题解释:
Notes:
Reference: Energy and Atmosphere Credit, On-Site Renewable Energy, Calculations
Energy calculations can come from the energy calculated by the Energy and Atmosphere Credit,
Optimize Energy Performance or the CBECS database.
分享到: QQ空间QQ空间 腾讯微博腾讯微博 腾讯朋友腾讯朋友
分享分享0 收藏收藏0
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-5-2 23:08 , Processed in 0.076162 second(s), 25 queries .

Powered by Discuz! X2.5 & Exam 1.4

© 2001-2012 Comsenz Inc.

回顶部