LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
44. Protect air quality and reduce pollution by minimizing the use of powered la admin 2017-6-13 0536 admin 2017-6-13 15:23
43. relationship between climate and physiological events, such as bud break, bl admin 2017-6-13 0557 admin 2017-6-13 15:23
42. -Create and implement an erosion, sedimentation, and pollutant control plan admin 2017-6-13 0802 admin 2017-6-13 15:23
41. -Locate reference soils to guide performance criteria
-Restore so
admin 2017-6-13 0606 admin 2017-6-13 15:23
40. Plant material, mineral and rock waste, and soils generated during all phase admin 2017-6-13 0534 admin 2017-6-13 15:23
39. Support healthy plants, biological communities, water storage, and infiltrat admin 2017-6-13 0555 admin 2017-6-13 15:23
38. Support healthy plants, biological communities, water storage, and infiltrat admin 2017-6-13 0557 admin 2017-6-13 15:23
37. Support a net-zero waste site and minimize down-cycling of materials by dive admin 2017-6-13 0585 admin 2017-6-13 15:23
36. Enhance a site\\\'s identity and meaning by protecting and maintaining signi admin 2017-6-13 0555 admin 2017-6-13 15:23
35. Historic or cultural landscapes (3pts)
-Identify and protect existi
admin 2017-6-13 0556 admin 2017-6-13 15:23
34. Hire a local workforce and support local business
>>Employ at least
admin 2017-6-13 0558 admin 2017-6-13 15:23
33. Improve human health by minimizing site users\\\' exposure to environmental admin 2017-6-13 0534 admin 2017-6-13 15:23
32. 1. Designate smoke free zones (1pt)
2. Prohibit smoking on site (2p
admin 2017-6-13 0535 admin 2017-6-13 15:23
31. Support sustainable practices in plant production by purchasing plants, sod, admin 2017-6-13 0569 admin 2017-6-13 15:23
30. Advocate = 1pt
Support providers that disclose = 3 pts
Sup
admin 2017-6-13 01454 admin 2017-6-13 15:23
29. Reuse salvaged materials (including plants) for at least:
10% of to
admin 2017-6-13 0566 admin 2017-6-13 15:23
28. This prerequisite applies to all new wood products purchased and installed o admin 2017-6-13 01290 admin 2017-6-13 15:23
27. 10 percent of the total existing built surface area: 2 points
20 pe
admin 2017-6-13 0629 admin 2017-6-13 15:23
26. A measure of the material\\\'s ability to reject solar heat, as shown by a t admin 2017-6-13 0536 admin 2017-6-13 15:23
25. Create a soil management plan prior to construction: healthy soils, VSPZs, s admin 2017-6-13 0783 admin 2017-6-13 15:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-6-4 06:52 , Processed in 0.048838 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部