LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
24. (area of non-roof/0.5) + (area of high-reflective roof/0.75) + (area of vege admin 2017-6-13 0508 admin 2017-6-13 15:23
23. Support healthy plants, biological communities, and water storage and infilt admin 2017-6-13 0476 admin 2017-6-13 15:23
22. Completed vegetation worksheet describing site conditions and how plants are admin 2017-6-13 0547 admin 2017-6-13 15:23
21. Support healthy functioning of aquatic ecosystems for fish, other wildlife, admin 2017-6-13 0525 admin 2017-6-13 15:23
20. Reduce reduce water use by at least 75% from a baseline case beyond the esta admin 2017-6-13 0510 admin 2017-6-13 15:23
19. Reduce negative impacts to aquatic ecosystems, channel morphology, and dry w admin 2017-6-13 0495 admin 2017-6-13 15:23
18. As defined by the U.S. EPA Technical Guidance on Implementing the Stormwater admin 2017-6-13 0590 admin 2017-6-13 15:23
17. Provide a connection to the local climate and hydrology by integrating aesth admin 2017-6-13 0514 admin 2017-6-13 15:23
16. Requirements
1. Form an integrated design team
2. Develop
admin 2017-6-13 0809 admin 2017-6-13 15:23
15. Owner/client
Site Users
Design
Construction
admin 2017-6-13 0526 admin 2017-6-13 15:23
14. Land other than prime farmland that is used for the production of specific h admin 2017-6-13 0520 admin 2017-6-13 15:23
13. Invasive species present within VSPZs must be treated using equipment that c admin 2017-6-13 0515 admin 2017-6-13 15:23
12. Management activities within VSPZs must not reduce the function and resilien admin 2017-6-13 0583 admin 2017-6-13 15:23
11. Maximize the benefits of ecosystem services by designating and communicating admin 2017-6-13 0523 admin 2017-6-13 15:23
10. Communicate locations and protective measures of VSPZs to construction and m admin 2017-6-13 0496 admin 2017-6-13 15:23
9. Maximize the opportunities for beneficial site performance by conducting an a admin 2017-6-13 0536 admin 2017-6-13 15:23
8. Previously developed and brown field sites within floodplain
-Require
admin 2017-6-13 0492 admin 2017-6-13 15:23
7. Sites with naturally occurring poor quality aquatic ecosystems
-demon
admin 2017-6-13 0528 admin 2017-6-13 15:23
6. Greenfield Sites
-as for case 1 but assess entire site
admin 2017-6-13 0500 admin 2017-6-13 15:23
5. Sites with farmland soils - VSPZs
-Require NRCS Web Soil Survey Map s
admin 2017-6-13 0506 admin 2017-6-13 15:23

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-3-29 04:11 , Processed in 0.075632 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部