LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
What do all project types have to document for MR Prerequisite Ongoing Purchasin admin 2016-12-22 0377 admin 2016-12-22 11:37
If a transportation survey is conducted in person what strategy will yield accur admin 2016-12-22 0900 admin 2016-12-22 11:37
What is the upper cost for items to be considered low-cost improvements, as the admin 2016-12-22 0397 admin 2016-12-22 11:37
A project building is located within 1/4 mile (400 meters) walking distance of a admin 2016-12-22 0396 admin 2016-12-22 11:37
What are energy efficiency best management practices used for? admin 2016-12-22 0948 admin 2016-12-22 11:37
After project registration you find a credit the project is attempting is listed admin 2016-12-22 0666 admin 2016-12-22 11:37
A project with an evaporative condenser uses 100% potable water for cooling. Whi admin 2016-12-22 0933 admin 2016-12-22 11:37
Which team member is primarily responsible for lead development of the building admin 2016-12-22 0361 admin 2016-12-22 11:37
A school project in Arizona will include no irrigation for the landscaping. How admin 2016-12-22 0768 admin 2016-12-22 11:37
Which action would be aided by gathering data from an advanced metering system i admin 2016-12-22 0447 admin 2016-12-22 11:37
A project team will use a non-potable water source to increase the number of cyc admin 2016-12-22 0344 admin 2016-12-22 11:37
What fixtures need to be shielded for Light Pollution Reduction? admin 2016-12-22 0747 admin 2016-12-22 11:37
Where should water submeters meters be located? admin 2016-12-22 0360 admin 2016-12-22 11:37
A project building has a renewable energy system to offset the building\\\'s ann admin 2016-12-22 0758 admin 2016-12-22 11:37
A 2-story 20,000 square foot office space has 3 rooftop HVAC units. Two units se admin 2016-12-22 0482 admin 2016-12-22 11:37
During the performance period what needs to be implemented for existing building admin 2016-12-22 01012 admin 2016-12-22 11:37
What is the minimum contract length required for Demand Response credit? admin 2016-12-22 0847 admin 2016-12-22 11:37
Ongoing testing is required to ensure the performance of the building is maintai admin 2016-12-22 0334 admin 2016-12-22 11:37
How many cleanliness levels exist in APPA\\\'s Custodial Staffing Guidelines? admin 2016-12-22 0892 admin 2016-12-22 11:37
What should be considered when developing a recycling policy for lamps containin admin 2016-12-22 0836 admin 2016-12-22 11:37

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-11-3 22:05 , Processed in 0.076931 second(s), 12 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部