LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7700

作者 回复/查看 最后发表
A project team is implementing a fixture and fitting replacement and retrofit po admin 2016-12-22 01311 admin 2016-12-22 11:37
If a project team reduces turf areas and shifts to more natural native landscapi admin 2016-12-22 01247 admin 2016-12-22 11:37
A public utility uses proprietary wireless technology to read the water meter fo admin 2016-12-22 0533 admin 2016-12-22 11:37
EQ Prerequisite ETS Control prevents or minimizes exposure of environmental toba admin 2016-12-22 01343 admin 2016-12-22 11:37
How can projects located outside the United States demonstrate minimum outdoor a admin 2016-12-22 01371 admin 2016-12-22 11:37
A project has a BAS but the system does not monitor outdoor airflow rates. Who w admin 2016-12-22 0566 admin 2016-12-22 11:37
When determining the project\\\'s goals with the owner\\\'s and tenant\\\'s orga admin 2016-12-22 0534 admin 2016-12-22 11:37
How often are projects eligible to be recertified? admin 2016-12-22 0534 admin 2016-12-22 11:37
How do renewable energy systems reduce the environmental and economic harms asso admin 2016-12-22 0533 admin 2016-12-22 11:37
A green cleaning policy addresses all of the following EXCEPT: admin 2016-12-22 0528 admin 2016-12-22 11:37
What minimum ENERGY STAR score is required to earn points for a project? admin 2016-12-22 0515 admin 2016-12-22 11:37
If the results of an occupant survey indicate that more than _____of the occupan admin 2016-12-22 01224 admin 2016-12-22 11:37
A project team is working in a country that does not have WaterSense equivalents admin 2016-12-22 01395 admin 2016-12-22 11:37
A lighting designer is using a lighting measurement tool to determine if the ext admin 2016-12-22 01391 admin 2016-12-22 11:37
A landscape architect is performing a yearly inspection of LID measures used for admin 2016-12-22 01197 admin 2016-12-22 11:37
In a multi-tenant project several tenants have contracts with waste haulers that admin 2016-12-22 0535 admin 2016-12-22 11:37
An office project in a cold climate burns natural gas on-site for heating and us admin 2016-12-22 0663 admin 2016-12-22 11:37
Which enhanced IAQ strategy is not available for naturally ventilated spaces? admin 2016-12-22 01363 admin 2016-12-22 11:37
Which of the following is a best practice for the safe disposal of batteries? admin 2016-12-22 01064 admin 2016-12-22 11:37
For Thermal Comfort a system alarm must be triggered when measured temperature i admin 2016-12-22 0550 admin 2016-12-22 11:37

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2026-6-4 04:02 , Processed in 0.037900 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部