LEED GAP

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
收藏本版 |订阅

试题解析 今日: 0|主题: 7599

作者 回复/查看 最后发表
On a project a waste hauler weighs cardboard waste in pounds but the project tea admin 2016-12-22 0294 admin 2016-12-22 11:37
A project team reviews a project design and finds that the design does not compl admin 2016-12-22 0298 admin 2016-12-22 11:37
A building operator has noticed in the month of June the cooling system is using admin 2016-12-22 0323 admin 2016-12-22 11:37
Which enhanced IAQ strategy is not available for mechanically ventilated spaces? admin 2016-12-22 0288 admin 2016-12-22 11:37
A school will be providing the community with access to some of the school\\\'s admin 2016-12-22 0779 admin 2016-12-22 11:37
A project team is conducting a waste audit on during a typical period of waste g admin 2016-12-22 0842 admin 2016-12-22 11:37
A project site already meets the 5% vegetation threshold for SS Credit Site Impr admin 2016-12-22 0988 admin 2016-12-22 11:37
The daylight option is most easily archived in what type of building? admin 2016-12-22 0287 admin 2016-12-22 11:37
A project team hired a water-treatment professional to analyze the makeup water admin 2016-12-22 0722 admin 2016-12-22 11:37
$20,000 worth of carpet was purchased from a manufacturer that will take back th admin 2016-12-22 0906 admin 2016-12-22 11:37
What is the minimum frequency of analysis in the first year of Ongoing Commissio admin 2016-12-22 0629 admin 2016-12-22 11:37
Vertical landscaping would help a project with which type of view? admin 2016-12-22 0676 admin 2016-12-22 11:37
What is the primary role of the owner for the planning of an energy audit? admin 2016-12-22 0796 admin 2016-12-22 11:37
What amount of space needs to be audited for achievement of IEQ Credit Green Cle admin 2016-12-22 0734 admin 2016-12-22 11:37
What minimal measurements must be taken for air temperature and humidity to achi admin 2016-12-22 0278 admin 2016-12-22 11:37
What must a school project include to indicate smoking is not allowed? admin 2016-12-22 0939 admin 2016-12-22 11:37
A building has a 100,000 SF (9,290 m2) roof. What roofing materials, if present, admin 2016-12-22 0877 admin 2016-12-22 11:37
A 25,000 SF (2,325 m2) mixed-use building is cooled by four rooftop units (RTUs) admin 2016-12-22 0745 admin 2016-12-22 11:37
What minimum perimeter measurements are required for Light Pollution Reduction? admin 2016-12-22 0349 admin 2016-12-22 11:37
If CFC-based refrigerants are maintained in the building, annual leakage rate mu admin 2016-12-22 0297 admin 2016-12-22 11:37

快速发帖

还可输入 80 个字符
您需要登录后才可以发帖 登录 | 立即注册

关闭

站长推荐上一条 /1 下一条

Archiver|手机版|LEED GA/LEED AP考试学习平台|版权所有|备案号(沪ICP备11019119号-2)|leedgap   

GMT+8, 2025-9-12 06:17 , Processed in 0.073300 second(s), 13 queries .

Powered by Discuz! X2.5

© 2001-2012 Comsenz Inc.

回顶部